Clean-up of flood-affected areas in the River Murray region has commenced. So far, clean-up measures include street waste clearances, sandbag removal, disposal vouchers and structural assessments.
To see what support is being provided in real-time, see the flood clean-up map.
Throughout the clean-up, there has been a focus on diverting as much of the flood-affected materials from landfill as possible.
To date, 2,992t of flood-affected materials have been removed from the region, including:
- 83t of metal, sent to Ferris Scrap Metal for recycling
- 1,052t of green waste, sent to Jeffries for composting
- 1,857t of waste, sent to landfill.